About Me

My photo
POOLE, DORSET, United Kingdom

27 December 2010

LOVE BIRDS

LAST NIGHT (26TH DEC) I STARTED THE LOVE BIRDS BY ALAN DART FROM SIMPLY KNITTING. FINISHED 27TH DEC LATE EVENING .

WONT MISS A COPY NEXT YEAR AS HAD A YEARS SUBSCRIPTION TO IT, FROM MY DAUGHTER.

ALL ITEMS I KNITTED FOR OTHERS WERE LOVED, THE RAT WAS A BIG HIT WITH MOTHER INLAW, LOLOLOL



16 December 2010

15 December 2010

UPDATE ON ORDERS FOR JUMPERS

RIGHT QUICK UPDATE. AS STILL NOT FEELING TO BRIGHT, JUMPER 2 , ADULTS TRAIN JUMPER IM ALMOST FINISHED THE FRONT, THEN KNIT THE NECK AND SEWING UP, AS LONG AS I DONT DROP DOWN DEAD OR AN ARM FALLS OF THEY WILL BE POSTED FIRST THING FRIDAY THE 17TH DEC,

SO ALL ITEMS DONE TO ORDER WILL BE ON THEIR WAY BY MONDAY THE 20TH DEC BY THE LATEST.

THEN START AGAIN FOR NEXT YEAR.

9 December 2010

BARBED WIRE part 2

ALL NIGHT I WAS SLEEP,WAKE, SLEEP, WAKE, MY THROAT IS SO SORE,


HOPE C DR LATER, THINK IT COULD BE TONSILITIS, I THOUGHT WAS START OF A COLD BUT NOT THIS SORE.


FINISHED THE BACK OF THE 2ND ADULT JUMPER, JUST FRONT TO DO AND SEW IT UP THEN POST THEM.


UPDATE. SPOKE TO DR I HAVE TONSILITIS

7 December 2010

BARBED WIRE

Oh no my throat feels like its got barbed wire in it, so sore if i cough.....

hope it dont go in to a bad cold, got knitting to finish...........plenty of lemsips

ita my anniversary cold, had a cold a year ago and thats when i stopped smoking, so a year since i had a fag.......

4 December 2010

C AND G IN KNITTING MODULE 2

OH WOW had module 2 back from being marked, i was so chuffed, all was ok, just need to do 2 extra bits of knitting,

module 3 to start after xmas.

NOVEMBER WAS HELL

What a month nov was, on the 12th my hubby vanished of the face of the earth, police were involved, he came back the following wed, slight break down, he was sleeping rough,  so i didnt eat for all that time, nor did any knitting.

all back on line now, just got to do face on james cardigan,

1st adult jumper done, just need to tidy pic up on the inside back front,

second adult jumper done 2 sleeves.

so all jumpers orderd will be posted to customers in time for xmas.  pics to follow when completed